Stem Installation Manual PV - REV 19

How to install STEM, Inc. hardware 

Key Updates on this revision:

  • New PowerTrack Logger
  • Removed RT1 and SR15 Sensors
  • Updated figures, pictures and drawings
  • New Junction Box with OVP
  • Fleshed out UPS section

 

For help with commissioning, there are many options:

FREE 1 - Call support at 866-303-5668 option 2, select onsite support and wait or leave a message to keep your spot in the queue
FREE 2 - Schedule a "we'll call you on-site appointment" using our online scheduler tool: https://alsoenergysupport.setmore.com

Cost 1 - Dedicated Remote Commissioning Support - engineering resource to schedule a call with
Cost 2 - On-Site Commissioning Support - Stem sends a certified tech to help with site commissioning. They are not electricians, they do not install hardware.

Site Configuration Help:

Free 1 - Training session about site modeling, schedule here: https://calendly.com/stem-ae
Free 2 - Read and watch videos in the KB about setting up alerts and modelling

Cost 1 - Advanced Site Configuration Service - We ask you to complete a spreadsheet/survey, then our team enters details into PowerTrack for you
Cost 2 - Advanced Site Configuration Plus - We will read your As-Built drawings and pull equipment from there and conversations with you to build your PowerTrack model

  • Attached Files
  • Stem Installation Manual PV - REV 19.pdf (3.9 MB) 10